Story Architecture & Beat Map
Story Architecture — Acts & Beats
The film spans ~3 weeks and follows a 2:2:1 structural ratio: Act I (order & denial), Act II (collapse & isolation), Act III (understanding & restoration).
Chronological Story Bible (Day 0–19)
Cold Open — Ray Hanlon in fog; dog, trowel, truffle; battery swap; pressure drop; offscreen strike. Day 2 broadcast. Mason’s errands. Weekend carcasses. Night 5 search and first vanishings. Night 6 tower outage and Mason’s death. Morning 7 discovery. Night 9 Liv & Hall on the porch; later, Hall’s fatal crash. Day 11 false relief after a lion is shot. Night 12 Ruiz brothers. Day 13 FR‑12 closure. Days 14–17 isolation. Day 18 Liv constructs the lure. Night 18 barn & clearing. Dawn 19 restoration with white porch light.
Shotlists — Key Sequences
Cold Open — “Volunteer Naturalist”
- 70 mm wide: Ray + fog + beam; breath silver.
- Insert: trowel pulls pale truffle; cloth bag drop.
- CU: game camera LED — red→green; forest sound drains.
- Tele: cougar silhouette crossing a gap — eyeshine; gone.
- MS: bear carcass — ribs bowed outward; no drag.
- Audio motif: dog bark (off) → “Home.” → two shots → vacuum.
- Hold: revolver + trowel in leaf duff; oval depression.
Hall’s Crash
- Locked 70 mm, distant; cruiser glides through fog.
- Overhead shadow passes as abstract motion blur.
- Instinctive swerve; gravel spray; pine impact.
- One headlight cone; hissing steam; white airbag.
- Hold for absence; cut on wind’s return.
Barn & Clearing (Finale)
- Liv rigs flicker relay; lays humming cord; door ajar.
- Flicker → failure; pressure drop; dust ripples under sill.
- Zippo arc; ignition; propane roar; barn ruptures.
- Owl emergence → glide → crash (see Visibility Doctrine).
- Liv cross‑yard, breath visible; three measured shots.
- Silence; white porch bulbs installed at dawn.
Scene Modules (Reproducible Blocks)
- Porch Visit: two‑shot on stoop; fluorescents hum; dialogue in clipped procedurals; cut on ambient.
- Search Grid: handheld 16 mm; green LED face‑isolation; fog density mid; radios degrade to squelch.
- Tower Maintenance: long lens lattice geometry; human vs. structure; red pulse cadence as metronome.
- Isolation Montage: generator hum, tarp nail‑down, frost on glass; no talking heads.
Beat Matrix — Day‑by‑Day
| Day | Weather / Light | Causality Focus | Key Sounds | Editorial Rhythm |
|---|---|---|---|---|
| NIGHT 0 | Patchy snow, low fog | First pattern stimulus (flicker, maintenance) | Wind pause → displacement thump → vacuum | Long holds; cut on absence |
| DAY 2 | Overcast AM | Institutional explanation forms (press) | Fluorescent buzz, small room tone | Procedural inserts; calm pace |
| DAYS 3–4 | Cold clear; frost | Evidence misread; fear organizes | Diner clatter; scanner hiss | Still frames, insert cutaways |
| NIGHT 5 | Dense fog; windless | First escalation; search failure | Green LED halos; radio squelch | Handheld 16 mm; interrupted screams off |
| NIGHT 6 | Fog bands, light snowmelt | Outage → maintenance → kill | Generator hum; cable creak | Telephoto geometry; fall on silence |
| MORNING 7 | Pale overcast | Consequences; Liv’s interior shift begins | Wind on lattice; unused words | Locked tableau discovery |
| NIGHT 9 | Haze, porch fluorescent | Empathy without answers; fatal commute | Thermos set; distant engine; crash hush | Two‑shot → static crash frame |
| DAY 11 | Flat daylight | False culprit killed | TV VO; click‑off | Short, factual beats |
| NIGHT 12 | Fog back; headlight flicker | Random cost; FR‑12 closes | One radio squelch; then none | Telephoto observation; no approach |
| DAYS 14–17 | Warm thaw; cold nights | Isolation; Liv studies manuals | Generator hum; tarp nails | Montage of doing |
| DAY/NIGHT 18 | Twilight → fire | Liv imitates pattern; lure armed | Flicker relay; pressure drop | Compression; cause & effect converge |
| DAWN 19 | Frost return; white | Restoration without triumph | Ambient morning; one crow | Static hold; cut to black |